Sign In | Join Free | My gastesters.com
China Qingdao Tsin Steel Structure Construction Technology Co.,Ltd. logo
Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
Verified Supplier

1 Years

Home > Steel Structure Building >

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction

Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction

Brand Name : TSIN

Model Number : TSIN

Certification : ISO, CE, SGS

Place of Origin : Shandong, China

Place Of Origin : Qingdao, Shandong, China

MOQ : 1000 sqm

Price : USD 40-60 / sqm

Payment Terms : T/T,L/C

Supply Ability : 100,000 sqm / month

Delivery Time : 6 weeks after shop drawing get approval

Packaging Details : Packed on steel pallet with fixture and loaded into 40'HQ/OT

Warranty : 5 Years

Maintenance Costs : Reduced

Labor Costs : Lower

Connection : Bolts

Insulation : EPS, Glasswool, Rockwool, PU On Option

Thickness Of Panel : 50mm, 75mm, 100mm, 150mm, 200mm, 250mm

Using Life : 50 Years

Product : Steel Structure

Material Grade : Q355B, Q235B

Structure type : Portal frame

Design Load : Wind, Snow, Seismic

Design software : PKPM, Tekla structures, CAD

Sand blasting : Sa 2.5

Surface treatment : Anti-corrosive paint or hot dipped galvanized

Contact Now

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction
Product Description
Modern Prefabricated Steel Building

The Modern Prefabricated Steel Building is engineered for easy assembly and recyclability, making it perfect for industrial warehouses, offices, and residential projects. Utilizing high-quality steel, it forms a robust load-bearing framework, known as the main frame, consisting of beams and columns.

Structural Components

The building features a comprehensive bracing system, which includes:

  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing

These components work in harmony with precision-engineered roof, wall, and floor systems to create a durable and stable metal structure.

Advantages Over Traditional Concrete Buildings
  • Enhanced Strength : Steel plates or sectional steel replace reinforced concrete, providing superior structural strength and improved seismic resistance.
  • Faster Construction : Prefabricated components are manufactured in factories and can be quickly assembled on-site, significantly reducing the construction period.
  • Sustainability : Steel is reusable and recyclable, contributing to reduced construction waste and promoting environmental responsibility.

This modern prefabricated steel building offers a versatile, efficient, and eco-friendly solution that seamlessly combines strength, speed, and sustainability.

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction
PRODUCT SPECIFICATIONS
Products Steel Structure Warehouse
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Sandwich panel with glass wool, rock wool,PU insulation,Corrug ated color steel sheet
Accessory Ridge tile, trim, Gutter, Down pipe,skylight, clerestory
Door Roll up door, industrial section door, swing door, Sliding door
Window PVC window, aluminum window, metal louver
Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction
Our Advantages
Advantages of Steel Structure Buildings
  1. Easy to Assemble
    Prefabricated steel components are installed on-site according to drawings. The assembly sequence includes:
    • Steel columns with cross-bracing
    • Roof beams and horizontal bracing
    • Purlins and enclosures
  2. Cost-Effectiveness
    The lightweight nature of steel reduces foundation expenses, while rapid construction allows for earlier operation. Overall economic benefits surpass those of traditional concrete buildings.
  3. Simplified Construction with Short Timelines
    Factory-manufactured components are assembled on-site, drastically shortening build time. A 4,000㎡ steel structure can be installed in approximately 40 days.
  4. Energy-Efficient & Eco-Friendly
    Corrugated color steel sheets and sandwich panels offer energy-saving properties. Dry construction minimizes dust and pollution, while steel's recyclability further reduces environmental impact.
Design Key Factors
  1. Optimal Column Spacing
    Using H-section steel for columns and beams, column spacing (typically set at 6.8-9m) directly influences steel usage and costs. Building height should meet functional requirements for equipment and maintenance access.
  2. Proper Lighting & Ventilation
    Large-span interiors require energy-efficient designs. For taller buildings, operable ground-floor windows serve as primary air inlets, complemented by roof ventilators for effective lighting and ventilation.
Differences vs. Concrete Buildings
  1. Shorter Construction Period
    Minimal on-site welding in prefabricated components makes steel structure construction significantly faster than concrete builds.
  2. More Eco-Friendly
    Steel components are hoisted and spliced without water, reducing dust and pollution in surrounding areas.
  3. Better Cost Performance
    Faster construction reduces labor costs, with total expenses approximately 20-30% lower than traditional concrete buildings. Steel also offers greater durability.
  4. Lighter Structure
    Lightweight metal walls and roofs significantly reduce overall weight, easing foundation loads compared to brick-concrete alternatives.
Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction
FAQ
  1. What materials are used in your steel structure buildings?
    Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.
  2. What certifications do your steel structure buildings have?
    Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.
  3. How long is the construction period of a steel structure building?
    The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.
  4. Can steel structure buildings be customized according to needs?
    Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.
  5. Do you provide installation guidance for steel structure buildings?
    We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.

Product Tags:

Hotel Steel Structure Building

      

Office Steel Structure Building

      

Prefabricated metal frame buildings

      
China Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction wholesale

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)